World News

New Trains for Germany: Alstom Secures Major Baden-Württemberg Contract

26 Coradia Max double-decker trains will boost regional capacity starting December 2026

Alstom has signed a contract to supply 26 additional Coradia Max double-decker trains to Baden-Württemberg’s rail authority, marking another significant investment in Germany’s regional rail network.

The new trains will be phased into service starting in December 2026, bringing modern, high-capacity rolling stock to one of Germany’s most economically important states.

The Deal at a Glance

DetailInformation
ManufacturerAlstom
Train TypeCoradia Max (double-decker EMU)
Quantity26 trains
CustomerBaden-Württemberg rail authority (NVBW)
Delivery StartDecember 2026
PurposeRegional passenger services

What Is the Coradia Max?

Alstom to supply DB Regio with new high-capacity trains

The Coradia Max is Alstom’s latest generation of double-decker electric multiple units (EMUs), designed specifically for high-capacity regional services.

Key Features

FeatureDetails
ConfigurationDouble-decker design for maximum passenger capacity
TractionElectric (overhead catenary)
SpeedUp to 160 km/h
AccessibilityLow-floor entry areas, wheelchair spaces, accessible toilets
ComfortAir conditioning, Wi-Fi, power outlets, modern passenger information systems
SustainabilityEnergy-efficient design, regenerative braking, recyclable materials

The Coradia Max platform represents Alstom’s answer to Germany’s growing demand for regional trains that can handle heavy commuter flows while meeting modern comfort and environmental standards.

Why Baden-Württemberg Needs New Trains

Baden-Württemberg, home to Stuttgart, Karlsruhe, Heidelberg, and Freiburg, is one of Germany’s most densely populated and economically powerful states. Its regional rail network faces significant challenges:

Growing Demand

  • Population: Over 11 million residents
  • Economic Powerhouse: Home to Mercedes-Benz, Porsche, Bosch, and SAP
  • Commuter Flows: Heavy daily traffic between Stuttgart and surrounding cities
  • Tourism: Black Forest, Lake Constance, and Rhine Valley attract millions of visitors
  • University Cities: Heidelberg, Freiburg, Tübingen generate student commuter traffic
See also  Siemens Vectron Approved for 230 km/h Passenger Service Across Six Countries

Aging Fleet

Many regional trains in Baden-Württemberg date from the 1990s and early 2000s. The new Coradia Max trains will:

  • Replace older, less efficient rolling stock
  • Increase passenger capacity on crowded routes
  • Improve reliability and reduce maintenance costs
  • Enhance passenger comfort and accessibility
  • Meet stricter environmental standards

The Deutschland-Ticket Effect

Since the introduction of the €49 Deutschland-Ticket in May 2023, regional train usage has surged across Germany. Baden-Württemberg has seen particularly strong growth, putting pressure on existing capacity. New double-decker trains are essential to meet this increased demand.

Where Will the Trains Operate?

While specific route assignments have not been confirmed, Baden-Württemberg’s busiest regional corridors are likely candidates:

RouteCurrent Situation
Stuttgart S-Bahn networkHeavily used suburban services
Stuttgart — KarlsruheMajor intercity regional corridor
Stuttgart — HeilbronnCommuter-heavy route
Karlsruhe — BaselRhine Valley traffic
Stuttgart — Tübingen — ReutlingenUniversity commuter route
Mannheim — Heidelberg — StuttgartKey economic corridor

The double-decker configuration is particularly suited to routes with high passenger volumes but limited train frequency, allowing more travelers per service without increasing the number of trains.

Alstom’s Growing Presence in Germany

This contract reinforces Alstom’s position as a major supplier to the German rail market. The company has significant manufacturing and engineering presence in Germany following its acquisition of Bombardier Transportation in 2021.

Alstom in Germany

FacilityFocus
SalzgitterTrain manufacturing
Hennigsdorf (Berlin)Train manufacturing, engineering
BraunschweigSignaling and rail control
MannheimComponents and services

The Coradia Max trains for Baden-Württemberg will be manufactured at Alstom’s German facilities, supporting local employment and supply chains.

See also  The Japanese Shinkansen: Is the World’s Best Train Network Worth the Cost?

Previous German Orders

Alstom has secured numerous German regional rail contracts in recent years:

CustomerTrainsType
DB RegioMultiple ordersVarious Coradia platforms
Go-AheadRegional servicesCoradia Continental
LNVG (Lower Saxony)Coradia MaxDouble-decker EMUs
Various LänderOngoingBattery and hydrogen trains

Technical Specifications: Coradia Max

The Coradia Max platform offers flexibility and modern technology:

First Coradia Max high-capacity regional train produced by Alstom's Chorzów plant

Design Philosophy

AspectApproach
CapacityMaximized through double-deck design
ModularityConfigurable length (3-6 cars)
InteroperabilityDesigned for German rail network standards
MaintenancePredictive maintenance systems, easy component access

Passenger Features

FeatureBenefit
Wide doorsFast boarding and alighting, reduced dwell times
Open gangwaysMovement between cars, increased capacity
Large windowsNatural light, scenic views
Modern lightingLED systems with adjustable brightness
Real-time informationScreens showing next stops, connections, delays
Quiet zonesDesignated areas for peaceful travel
Family areasDedicated spaces with extra room
Bike storageSpaces for bicycles (Germany’s strong cycling culture)

Environmental Performance

FeatureImpact
Regenerative brakingEnergy recovery during deceleration
Lightweight constructionReduced energy consumption
Efficient HVACLower power usage for heating/cooling
LED lightingReduced electricity consumption
Recyclable materialsEnd-of-life sustainability
Noise reductionQuieter operation for lineside communities

Timeline and Rollout

MilestoneExpected Date
Contract Signed2024
Manufacturing Begins2025
First Train DeliveryDecember 2026
Testing and Commissioning2026-2027
Full Fleet in Service2027-2028 (estimated)

The Commissioning Process

New trains in Germany undergo rigorous testing before entering passenger service:

  1. Factory Acceptance Tests — Initial testing at Alstom facilities
  2. Dynamic Testing — Trial runs on the rail network
  3. Homologation — Approval by Federal Railway Authority (EBA)
  4. Driver Training — Familiarization for train operators
  5. Passenger Service — Gradual introduction on scheduled routes
See also  European Sleeper Review: Paris-Berlin-Prague Night Train

Impact on Passengers

What Travelers Can Expect

BeforeAfter
Older trains with dated interiorsModern, bright, comfortable carriages
Limited capacity on peak servicesMore seats, less crowding
Variable accessibilityConsistent step-free access
Inconsistent Wi-Fi/powerReliable connectivity throughout
Higher maintenance delaysImproved reliability

For Commuters

The new double-decker trains will be particularly welcome for daily commuters who currently face:

  • Standing-room-only conditions on peak services
  • Older rolling stock with less comfortable seating
  • Less reliable trains requiring more maintenance
  • Limited power outlets for working during commute

For Tourists

Visitors to Baden-Württemberg will benefit from:

  • More comfortable journeys to Black Forest destinations
  • Better connections around Lake Constance
  • Modern trains on the scenic Rhine Valley routes
  • Improved accessibility for travelers with luggage

The Bigger Picture: Germany’s Regional Rail Investment

The Baden-Württemberg order is part of a nationwide push to modernize Germany’s regional rail fleet.

Why Germany Is Investing Now

DriverExplanation
Climate GoalsShift passengers from cars to trains
Deutschland-Ticket SuccessIncreased ridership demands increased capacity
Aging FleetMany trains from 1990s-2000s need replacement
EU RegulationsAccessibility requirements (TSI PRM)
CompetitionPrivate operators raising quality expectations
Reliability CrisisDB’s punctuality problems demand better equipment

Other Recent German Train Orders

State/OperatorManufacturerTrainsType
Schleswig-HolsteinStadlerFLIRTSingle-deck EMU
BavariaSiemensMireoVarious configurations
Lower SaxonyAlstomCoradia MaxDouble-decker EMU
North Rhine-WestphaliaVariousMultipleMixed fleet renewal
Baden-WürttembergAlstomCoradia MaxDouble-decker EMU

Challenges Ahead

While the new trains represent good news, challenges remain:

Infrastructure Constraints

New trains are only as good as the tracks they run on. Baden-Württemberg’s rail network faces:

  • Capacity bottlenecks around Stuttgart
  • Stuttgart 21 project delays affecting regional services
  • Track maintenance backlogs causing speed restrictions
  • Signaling limitations on some routes

Delivery Risks

The European rail industry has faced supply chain challenges:

  • Component shortages (semiconductors, specialized parts)
  • Skilled labor constraints
  • Testing and approval delays
  • Previous orders running behind schedule

Transition Period

Introducing new trains while maintaining existing services requires careful planning:

  • Driver training on new equipment
  • Maintenance facility adaptation
  • Timetable adjustments
  • Public communication about changes

What This Means for German Rail Travel

Short Term (2024-2026)

  • Existing trains continue operating
  • Anticipation builds for new fleet
  • Testing of first units begins late 2026

Medium Term (2026-2028)

  • Gradual introduction of Coradia Max trains
  • Older trains progressively withdrawn
  • Passenger experience improves on equipped routes

Long Term (2028+)

  • Modern fleet fully operational
  • Higher capacity supporting continued ridership growth
  • Template for other German states’ modernization

For Rail Enthusiasts

The arrival of new Coradia Max trains will be of interest to train spotters and photographers:

Spotting Opportunities

PhaseWhat to See
2025Test trains at Alstom facilities
2026First units on test runs in Baden-Württemberg
2026-2027Gradual introduction on passenger services
2027+Full fleet in regular operation

Technical Interest

  • Latest Alstom platform technology
  • German engineering and manufacturing
  • Modern passenger amenities
  • Double-decker design evolution

Conclusion

The order for 26 Coradia Max double-decker trains represents a significant step forward for Baden-Württemberg’s regional rail network. As one of Germany’s most economically dynamic and densely populated states, the region urgently needs modern, high-capacity rolling stock to meet growing demand.

For passengers, the new trains promise:

  • More capacity — Double-decker design means more seats
  • Greater comfort — Modern interiors with contemporary amenities
  • Better reliability — New trains mean fewer breakdowns
  • Improved accessibility — Meeting current standards for all travelers
  • Environmental benefits — Efficient, sustainable technology

For Germany’s rail system, the order demonstrates continued commitment to regional rail investment, even as the national network faces criticism for delays and reliability issues. New trains alone will not solve all problems, but they are an essential component of a functioning railway.

The first Coradia Max trains will enter service in December 2026. For the commuters of Stuttgart, Karlsruhe, and beyond, that date cannot come soon enough.


Stay Updated:

More capacity. More comfort. Coming December 2026.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button